#5
Proposal for high-speed automation in a short cycle!

#5
Proposal for high-speed automation in a short cycle!

村田機械(ムラテック)平行2軸型CNC旋盤MW100Ⅱ

Challenges

困っている作業員イラスト

“There are many machines that need to be replaced due to aging, but we want to reduce the number of machines to be reinvested while maintaining the current production volume."

Points of the problem faced by the customer
  1.  The customer wants to reduce the cycle time in order to reduce the number of machines to be invested.
     
  2.  Since both the current production volume and the number of machines to be reinvested are large, they want to use this opportunity to automate and optimize the production line.
     
  3. If the machining time reduction is achieved, a “high-speed” transport device will be required.

Solutions

We verified the reduced cycle time through trial cutting, and also realized short- cycle high-speed transfer by using our Twin Gantry Loader!

1.Trial cutting was carried out at our factory, where the cycle time was actually reduced!

pecifically, we analyzed and verified the conventional machining program in cooperation with the customer.

As a result, we reduced both cutting time and non-cutting time while satisfying the accuracy requirements, and finally optimized the machining program.

2.In addition to the reduction of cycle time, efficient high-speed transfer has been realized by the Twin Gantry Loader!

For example, our twin-spindle turning center MW100Ⅱ equipped with the twin gantry loader can achieve a high-speed transfer cycle of as fast as 12 seconds (including loading and unloading time of about 6 seconds).

Therefore, if the cycle time is 12 seconds or longer (including about 6 seconds for loading and unloading), the machining cycle can be performed very efficiently without machining waiting for the loader.

loader cycle

Effects after introduction

The customer becomes able to save the number of invested machines without changing the production volume, resulting in savings of both investment cost and installation space.

In addition, through this kind of automation, the man-hours for the production line were greatly reduced.

Also, the reduction in the number of invested machines has made maintenance much easier.

Effects after introduction

Product Information

Twin Spindle CNC Chucker MW100Ⅱ

The product in the case study introduced here is the Twin Spindle CNC Chucker ”MW100Ⅱ”
 

If you have any questions,
please feel free to contact us

RELATION

Related page

CONTACT

If you are considering automated production,
please contact Muratec.

If you have any questions, please contact us here

ページトップへ戻る